Physical Risk Score

56 Moderate

Location

Overall Risk Score

56
Moderate

Vulnerability

0.77x Low

Country

0.77x

V: 0.28 R: 0.73

Asset

1.0x

Score

20/100

ND-GAIN Country Index × asset mitigations. Values <1.0 reduce damage; >1.0 amplify it.

Financial Summary

Asset Value

$10,000,000

ADR

4.49%

Annual Loss

$448,890

CVaR 95%

$1,570,438

CVaR 99%

$3,445,444

Business Impact

Direct Damage $251,533
Productivity Loss $0
Total Impact $251,533

Hazard Scores

๐ŸŒก๏ธ Scored

Heat

100 High

Heat Index Days >35ยฐC (174.9 days) · Also: Wet Bulb Temp, Heat Index

โ˜€๏ธ Scored

Drought

18 Low

Consecutive Dry Days (96.6 days) · Also: SPEI-12 Drought Index, Water Depletion

๐ŸŒŠ Scored

Flood

24 Low

Interannual Variability (2.6 score 0-5) · Also: Max 1-Day Precipitation, Very Heavy Precip Days >50mm

๐Ÿ”ฅ Scored

Wildfire

100 High

Fire Weather Index Max (49.8 index) · Also: FWI Long Season

๐ŸŒฌ๏ธ Scored

Wind

100 High

TC Max Wind Speed (81.4 m/s) · Also: TC Annual Probability (CCKP), Major TC Probability (CCKP)

โ„๏ธ Scored

Cold

4 Low

Cold Spell Duration (0.3 days) · Also: Frost Days, Growing Season Length

๐Ÿ–๏ธ Scored

Sea Level

28 Low

Mean Sea Level (CCKP) (0.2 m)

๐Ÿ’ง Scored

Water

74 High

Consecutive Wet Days (52.6 days) · Also: Max 1-Day Precipitation, Max 5-Day Precipitation

Risk Matrix

Hazard likelihood vs. impact for this asset

Risk Matrix

Likelihood →
Low
Medium
High
Very High
Very High
๐ŸŒฌ๏ธ๐Ÿ”ฅ๐ŸŒก๏ธ
High
๐Ÿ’ง
Medium
๐Ÿ–๏ธ
Low
โ„๏ธ๐ŸŒŠ
โ˜€๏ธ
↑ Impact

Physical Risk Analysis

Annual Damage Ratio Breakdown

Hazard Score ADR % Est. Annual Loss
Heat 100 0.381% $38,077
Drought 18 0.158% $15,849
Flood 24 0.328% $32,850
Wildfire 100 1.349% $134,943
Wind 100 1.396% $139,563
Cold 4 0.011% $1,090
Sea Level 28 0.07% $7,027
Water 74 0.795% $79,493
Total 56 4.489% $448,890

Operational Impact

Climate-driven operational cost projections

Insurance Premium

$793,577

+ 36.0% vs baseline

Utility Change

$0

0.0% of revenue

Workforce Loss

$13,500

3.0% productivity

Maintenance

$0

+0.0%

Downtime

10 days

heat 0 / flood 0 / storm 10

Insurability

High Risk

WACC +673bps

Adaptation Recommendations

Ranked interventions by 10-year ROI

Intervention EAL Before EAL After Annual Savings Cost Payback 10yr ROI
Building Retrofit $307,355 $247,480 $59,874 $110 0.0yr 544211.6%
Fire Suppression System $134,943 $68,348 $66,595 $45,000 0.7yr 1379.9%
Flood Barriers $39,877 $23,822 $16,054 $85,000 5.3yr 88.9%
Cooling Systems $38,077 $26,703 $11,374 $65,000 5.7yr 75.0%
Insurance Coverage $368,307 $310,909 $57,398 $552,461 9.6yr 3.9%