Perth, City of Perth, Western Australia, 6000, Australia

Coordinates: -31.9559, 115.8606
Sector: Human health and social work

Address: Perth, City of Perth, Western Australia, 6000, Australia

Physical Risk Score

38 Low

Location

Overall Risk Score

38
Low

Vulnerability

0.77x Low

Country

0.77x

V: 0.28 R: 0.73

Asset

1.0x

Score

20/100

ND-GAIN Country Index × asset mitigations. Values <1.0 reduce damage; >1.0 amplify it.

Financial Summary

Asset Value

$10,000,000

ADR

2.58%

Annual Loss

$257,970

CVaR 95%

$1,044,376

CVaR 99%

$2,294,533

Business Impact

Direct Damage $132,518
Productivity Loss $0
Total Impact $132,518

Hazard Scores

๐ŸŒก๏ธ Scored

Heat

62 Moderate

Warm Spell Duration (21.4 days) · Also: Wet Bulb Temp, Heat Index

โ˜€๏ธ Scored

Drought

46 Moderate

Water Depletion (5.0 score 0-5) · Also: SPEI-12 Drought Index, Consecutive Dry Days

๐ŸŒŠ Scored

Flood

16 Low

Interannual Variability (2.8 score 0-5) · Also: Max 1-Day Precipitation, Very Heavy Precip Days >50mm

๐Ÿ”ฅ Scored

Wildfire

100 High

Fire Weather Index Max (84.5 index) · Also: FWI Long Season

๐ŸŒฌ๏ธ Scored

Wind

17 Low

TC Max Wind Speed (18.4 m/s) · Also: TC Annual Probability (CCKP)

โ„๏ธ Scored

Cold

11 Low

Heating Degree Days (653.7 ยฐF-days) · Also: Cold Spell Duration, Frost Days

๐Ÿ–๏ธ Scored

Sea Level

29 Low

Mean Sea Level (CCKP) (0.2 m)

๐Ÿ’ง Scored

Water

25 Low

Water Stress (5.0 score 0-5) · Also: Max 1-Day Precipitation, Max 5-Day Precipitation

Risk Matrix

Hazard likelihood vs. impact for this asset

Risk Matrix

Likelihood →
Low
Medium
High
Very High
Very High
๐Ÿ”ฅ
High
๐ŸŒก๏ธ
Medium
๐Ÿ–๏ธ
๐Ÿ’ง
โ˜€๏ธ
Low
โ„๏ธ๐ŸŒฌ๏ธ๐ŸŒŠ
↑ Impact

Physical Risk Analysis

Annual Damage Ratio Breakdown

Hazard Score ADR % Est. Annual Loss
Heat 62 0.236% $23,607
Drought 46 0.405% $40,503
Flood 16 0.194% $19,392
Wildfire 100 1.349% $134,943
Wind 17 0.098% $9,782
Cold 11 0.03% $2,998
Sea Level 29 0.074% $7,355
Water 25 0.194% $19,393
Total 38 2.58% $257,970

Operational Impact

Climate-driven operational cost projections

Insurance Premium

$497,239

+ 48.3% vs baseline

Utility Change

$0

0.0% of revenue

Workforce Loss

$13,500

3.0% productivity

Maintenance

$0

+0.0%

Downtime

0 days

heat 0 / flood 0 / storm 0

Insurability

Elevated

WACC +387bps

Adaptation Recommendations

Ranked interventions by 10-year ROI

Intervention EAL Before EAL After Annual Savings Cost Payback 10yr ROI
Building Retrofit $164,116 $132,146 $31,971 $110 0.0yr 290542.8%
Fire Suppression System $134,943 $68,348 $66,595 $45,000 0.7yr 1379.9%
Flood Barriers $26,746 $15,978 $10,768 $85,000 7.9yr 26.7%
Cooling Systems $23,607 $16,556 $7,052 $65,000 9.2yr 8.5%
Insurance Coverage $235,582 $198,868 $36,714 $353,372 9.6yr 3.9%